Well nearly done. The station building is now nearly complete. I still need to add a few extra details such as the piping out of the roof but now I just need to paint it. The last run on the building ....many years after starting .
L
Tuesday, 4 August 2015
Saturday, 1 August 2015
Room with a view
So after a while away from modelling I'm back and so is my modelling Mojo. I've had a bit of time today remodelling the first floor frontage to the station. Removing the tiled front was a bit nerve wracking thinking I might damage all I'd achieved so far. I needn't have worried the front tiles (Wills) came off quite easily with a modelling knife to gently prise away. So progress so far is shown after a nice 2 hours listening to music and the rain pouring down outside .
Monday, 29 June 2015
Lamps for Lynton
Langley models lamps have received some paint ready for installation . I still need to add the telephone insulators that sat atop the lamps before putting in situ.
These Langley lamps come supplied with clear glass covers . However I've removed these as they seemed far too over scale.
These Langley lamps come supplied with clear glass covers . However I've removed these as they seemed far too over scale.
Sunday, 21 June 2015
The benefits of a thorough book
When I first built my model of the station building there wasn't the book " Measured and Drawn " to consult. Instead my research was based on a 7mm layout and the station building as I t exits today. Maybe if I had paid more attention I would have seen then in its original form that slate was not so abundant on the station front. So now I have other alterations to make courtesy of better research. Oh well , now how to rectify this ?
Tuesday, 16 June 2015
"Base -ics"
Lynton station building base needed some basic improvement so I have carefully created a more solid base using plastic sheet. This has improved the solidity of the structure enormously .
My plan is to seat the building into the platform by the same thickness of this base. Let's see how this works out ....
My plan is to seat the building into the platform by the same thickness of this base. Let's see how this works out ....
On the underside there's now better clearance for my rudimentary internal lighting wire . Another plus!
Monday, 1 June 2015
Framing the station
After some time not reporting any news here I'm pleased to now update on some changes I've made to the station building.The original model was made way back in 2001. Looking at the model more closely I could see some updating and improvements were in order. I've added framing to doors for one thing and taken the opportunity to improve the stability of what was in essence a fairly flimsily built card model.
The door framing is shown here
The door framing is shown here
Monday, 20 April 2015
Subscribe to:
Posts (Atom)



















