Tuesday, 20 December 2022
Backscene trouble
A couple of months ago I decided to try a Peco sky Backscene. I cut templates using lining paper from which the actual Backscene was cut out. To fix in place, double sided tape was used on the Backscene joints and 3M aerosol glue used to fix the photo Backscene in place. My first attempt behind the coal yard was a disaster as you can clearly see in the photos. This will be redone but the remainder fixed well as I developed and improved my method. The idea next is to add an overlay of some Devon hillside low against the sky Backscene.
Hole in the road
It’s been a while since the last post but I have been grabbing moments in between work and other jobs ( err distractions ) to make some useful progress on Lynton station. The scenic board with Larkscleave bridge is coming on nicely with static grass and a start made on trees. I’ve also made a start on placing the station building into the ground ( cardboard road and platform ) which I was delaying and procrastinating over thinking this would be difficult. In the end cutting open a hole to fit the building and getting the ground contour correct as best I could was not that difficult. I’m beginning to see interesting photographic alignment to the old station photographs.
Sunday, 10 April 2022
March April update 2022
Monday, 28 February 2022
February Update 2022
I’ve been busy these last few months moving the layout from a central position in the loft room to the rear. This has involved creating a new control panel at the front and dismantling the entrance curve to the station. After doing this my back is very grateful as I no longer have to continuously duck under. Why did I wait so long to do this? The extra space created in the centre of the room also gives me space to work easier without banging my head! The whole effort has been well worth it but it has taken quite some time.
The layout can now be controlled from the front and the rear should this ever be required. Initially, when I started the layout, I imagined possibly exhibiting but in reality as time has gone on I realise this will never happen and it will remain a home based layout. As such control from the rear is somewhat redundant now and the new control from the front will be the default. Setting up control from the front was for me a complicated exercise in electronics and extreme patience as I’m no electrician. However by taking my time I eventually managed to get everything to work to my satisfaction. I also took the opportunity to add polarity switches to all the points, this giving much better running. The layout is still in sections enabling me to move all the modules should I wish. This is useful I remind myself due to a loft hatch ( one very good reason) and should there be a house move for example, or even the offer of using a spare room ( I wish!) .
The curve entering the station had to be rebuilt as the curve now approaches in the opposite direction. All scenics were removed to be reused and a whole new baseboard was created with detachable legs and, as with the rest of the layout, is a separate module. This new section features a slight embankment based on the approach to Lynton via Larkscleave bridge with the aim to build a replication of this bridge and the woods surrounding . So far the land formation is progressing using the old style chicken wire and plywood formers method . I did consider trying carving polystyrene but vetoed this having read too many reports of snow men being formed. So chicken wire it is with a covering in plaster bandaging (Mod Roc) begun. I’ll share pictures in my next post. Maybe I’m old fashioned in my approach but it works for me. I do hope the pictures capture the work achieved in the last couple of months.
Sunday, 12 December 2021
A very long overdue update
I cannot quite believe my last post was January 2020. Unfortunately my old series 2 I Pad crashed some time ago and this was my "Go 2 " for updates to the Blog. I've managed to rescue the poor old thing today and thought it was about time I posted a little update on the layout. I have been quite busy both on the home front , DIY and work but also fortunately, for sanity, with much modelling.
First on the list was that during the first lockdown I decided to try and replicate the coal staithes in the goods yard. There is not very much photographic evidence to model from and the trusted bible "Measured and Drawn does not cover this either, but from the few photographs that do exist I managed to conjure up my best efforts seen here.
As you can see there is much more detailing required yet, and the ballasting will wait until everything runs as smoothly as possible. All of which brings me to my next topic; I've spent an enormous amount of time improving the running of the line and also adding a further control panel to the front of the layout. My "Master Plan 2021" is to move the whole layout to the back wall of the loft giving me far less back ache and easier access to extend the layout in the future .So, all of this will follow in my next posts. Until then.........
Saturday, 25 January 2020
Heljan model at Lynton continued
Sunday, 24 November 2019
Heljan Lyn at the Warley model show
I hope that the pictures here of Lyn show what a very nice model we have to look forward to in 2020!
Heljan Manning Wardle running test
I hope the short videos here help show the improvement in performance following the modifications mentioned in the previous post.
Monday, 5 August 2019
Upgrading the Pilton Ponies
So two evenings later - due in part to not understanding how white metal and brass don’t bond easily and I now have much improved looking models. The cow catcher on Taw ,which is the Langley kits version, fell off in the process but will be re attached now that the cylinder covers are in place.
The cow catchers are in fact a much sturdier design than those on the Heljan and I need to invest in a few more sets to replace those on the Heljan. My Heljan models have lost theirs repeatedly! The chivers model of Lew awaits the same.
Tuesday, 25 June 2019
Fixing a Heljan L&B 009 Manning Wardle
Sunday, 2 June 2019
Heljan L&B at Lynton
For now I’ll let the videos do the talking ..
Excelsior and the ballast train
The Greenery bit
This is just my initial ground cover and is just a starter. I hope to increase the cover with additional static grass.
I’ve also painted the wood facia with grey primer to help bring everything together and neater. The aim is to finish the facia surrounds off neatly so this is just an addition of paint to reduce the amount of bare woodwork . For the road surface I first attempted using dilute acrylics and as any of you could have anticipated it caused the card to warp. Fortunately this was not too severe and I hope can be remedied by using texture paints. So my initial remedy was then a repaint with the same grey primer as used on the wood work.One shot below shows a landscape view and in doing this shot it slightly distorts the view. My track laying is much smoother than this landscape shot demonstrates!
So for now a few views of the greenery...all structures shown simply placed for the photograph so please excuse any unsightly gaps and how they appear.
Next is more track testing and moving on to ballasting.










































